You don't have javascript enabled. Good luck with that.
Pencarian
Normalisasi Kali dan Saluran di Jakbar Capai 80 Persen

River and Channel Normalization in W. Jakarta Reaches 80 Percent

As many as Rp 237 billion was proposed by West Jakarta Sub-dept. of Water Management this year to normalize river, reservoir and channel in West Jakarta.

We proposed budget Rp 237 billion for the project this year

Imron Syahrin, head of agency, admitted his side keeps running the project. According to him, the project has reached 80 percent.

“We proposed budget Rp 237 billion for the project this year,” he said, Tuesday (11/22).

Ciliwung River Normalization in Bukit Duri Accelerated

Even though the project runs smoothly, but he wants the dump truck to be added from 68 units. His side will propose additional 35 trucks and 10 heavy equipments.

According to him, the additional trucks are needed since one locations needs eight trucks. Too much time wasted if the truck number is low.

Linked News
Popular News indeks
  1. Cilandak Drainage Upgraded to Mitigate Flooding

    access_time27-01-2026 remove_red_eye869 personTiyo Surya Sakti
  2. TransJabodetabek Expansion, a Strategic Step to Increase Public Transportation Use

    access_time26-01-2026 remove_red_eye424 personFakhrizal Fakhri
  3. Jakarta Prepares OMC and 200 Excavators to Prevent Flood

    access_time26-01-2026 remove_red_eye371 personDessy Suciati
  4. Jakarta Showers to Make Way for Partly Cloudy Skies

    access_time30-01-2026 remove_red_eye358 personDessy Suciati
  5. Several Microtrans Routes Diverted

    access_time31-01-2026 remove_red_eye358 personAldi Geri Lumban Tobing
close