You don't have javascript enabled. Good luck with that.
Pencarian
Normalisasi Kali dan Saluran di Jakbar Capai 80 Persen
.
photo TP Moan Simanjuntak - Beritajakarta.id

River and Channel Normalization in W. Jakarta Reaches 80 Percent

As many as Rp 237 billion was proposed by West Jakarta Sub-dept. of Water Management this year to normalize river, reservoir and channel in West Jakarta.

We proposed budget Rp 237 billion for the project this year

Imron Syahrin, head of agency, admitted his side keeps running the project. According to him, the project has reached 80 percent.

“We proposed budget Rp 237 billion for the project this year,” he said, Tuesday (11/22).

Ciliwung River Normalization in Bukit Duri Accelerated

Even though the project runs smoothly, but he wants the dump truck to be added from 68 units. His side will propose additional 35 trucks and 10 heavy equipments.

According to him, the additional trucks are needed since one locations needs eight trucks. Too much time wasted if the truck number is low.

Linked News
Popular News indeks
  1. Free Additional Nutritious Food Distributed to 31 Toddlers in Kalibata

    access_time13-09-2024 remove_red_eye1146 personTiyo Surya Sakti
  2. Jakarta Women's Football Team Ready to Face West Java at PON XXI Final

    access_time13-09-2024 remove_red_eye846 personFolmer
  3. Water Channel Dredging on Bendungan Melayu Reaches 50 Percent

    access_time18-09-2024 remove_red_eye826 personAnita Karyati
  4. Jakarta Leads Medal Standing at PON XXI

    access_time17-09-2024 remove_red_eye777 personFolmer
  5. PON XXI Temporary Standings: Jakarta Continues to Shadow East Java

    access_time13-09-2024 remove_red_eye755 personAldi Geri Lumban Tobing